Analisis Penjadwalan Proyek Gedung Bertingkat Menggunakan Metode CPM (Critical Path Method) dan PERT (Program Evaluation and Review Technique) (Studi Kasus: Proyek Pembangunan Tahap 1 Rumah Sakit Muhammadiyah Gresik)
Abstract
Time and cost are important and interrelated in the implementation of construction project activities. In the world of construction project that can be used as a measure of a project’s success is if the projet=ct can run according to the planned schedule with allocated costs in accordance with the quality of the materials used. The result of the analysis show that the CPM method is more efficient in terms of time and coast. The result of calculating the duration and cost of the CPM method produce a duration of 117 days with an allocated cost pf IDR 5.951.026.616, which is 19 days faster with a cost difference of IDR 307.764.792 compared to the PERT method. This research was conducted according to the calculation of the initial smart time of the project, namely on May 16, 2022 according to real sata. In the analysis in this study, scheduling planning using the CPM and PERT method was applied with the aim of knowing which method is more efficient in terms of time and cost.
Keywords
Full Text:
PDFReferences
Amiruddin Hi, 2012, Optimasi Pelaksanaan Proyek dengan Menggunakan PERT dan CPM, Artikel Universitas Nuku Tidore.
Angelin, A. and Ariyanti, S., 2019, Analisis Penjadwalan Proyek New Product Development Menggunakan Metode PERT dan CPM, Jurnal Ilmiah Teknik Industri, 6(1), 63–70.
Astari, N.M., Subagyo, A.M. and Kusnadi, 2021, Perencanaan Manajemen Proyek dengan Metode Critical Path Method (CPM) dan Program Evaluation and Review Technique (PERT), Jurnal Konstruksia, 13(1), 164–180.
Bangun, V.H. 2016, Analisa Perbandingan Waktu Penjadwalan Proyek dengan Metode CPM (Critical Path Method) dan PERT (Project Evaluation and Review Technique), 94.
Febriana, W. and Aziz, A., 2021, Analisis Penjadwalan Proyek dengan Metode PERT Menggunakan Microsoft Project 2016, Jurnal Surya Beton, 5(1), 37–45.
Iwano, E.R.M., Tjakra, J. and Pratasis, P.A.K. 2016, Penerapan Metode CPM pada Proyek Konstruksi (Studi Kasus Pembangunan Gedung Baru Kompleks Eben Haezar Manado) (Application of the CPM Method in Construction Projects (Case Study of the Construction of a New Building at the Eben Haezar Manado Complex), Jurnal Sipil Statik, 4(2337–6732), 551–558.
Pitunov, R. and HS, M.S. 2018, Identikasi Biaya Kualitas pada Proyek Transmart Carrefour Sidoarjo PT. Wijaya Karya Bangunan Gedung, Rekayasa Teknik Sipil, 3(3), 1–7.
Pratama, Y.A. 2020, Analisis Penjadwalan Proyek dengan Metode PERT, Skripsi, 81.
Permenpupr No. 1 Tahun 2022 tentang Pedoman Penyusunan Perkiraan Biaya Pekerjaan Umum dan Perumahan Rakyat.
DOI: http://dx.doi.org/10.33087/jiubj.v23i2.4126
Refbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
|