Analisis Pengendalian Biaya Konstruksi Gedung Asrama Dengan Metode Life Cycle Cost

Rini Pebri Utari, Abdul Samad

Abstract


Buildings have an important role for human life according to their functions. After the construction process is complete, the building is expected to carry out its functions according to the expected plan age. However, construction with substandard quality building materials causes the building to experience rapid damage resulting in more routine maintenance and high maintenance costs. The object of this research is the Asrema Gedung Putra Polytechnic Bali. One of the appropriate methods in analyzing the economic value of a building starting from planning, implementation and maintenance is to use the Life Cycle Cost Method. From the research results, it is found that four components make up the Life Cycle Cost, namely the initial cost or development cost of Rp. 6,407,566,714 (19%), operational costs Rp. 21,911,035,624 (64%), maintenance and replacement costs Rp. 5,622,402,603 (16%), and the cost for the destruction of Rp. 213,171,382 (1%). And from this research it is also known that the cost of the building component replacement cycle is in accordance with the regulation No. PU. 24 of 2008 so it is expected that the Jembrana Bali Marine and Fisheries Polytechnic Male Dormitory Building can stand for 50 years according to the expected building age.


Keywords


Construction Costs; Life Cycle Costs; Initial Costs; Financing Costs; Operational Costs

Full Text:

PDF

References


Heralova, R Schneiderova. 2019. Life Cycle Costing Of Public Construction Project. Iop Converence Series : Earth and Environmental Science. Central Europe toward Suistainable Building. doi : 10.1088/1755-1315/290/1/012060

Firsani, Trixsi. & Utomo, C., 2012. Analisa Life Cycle Cost pada Green Building Diamond Building Malaysia. teknik ITS, 1(September (2012)), pp.D34–D38.

Giatman. (2011) Ekonomi teknik. Jakarta: PT Raja Grafindo Persada Hestin dan Rully.(2011).Pemeliharaan bangunan: basic skill management.Yogyakarta:Andi

Janitra,Kevin.,Widyanugraha,Khrisna.,Alifin,Setiawardani. 2018. Perhitungan Life Cycle Cost Sistem Pendingin Ruangan Pada Gedung Hotel Goldvitel Surabaya. Jurnal Dimensi Pratama Teknik Sipil Volume 7, No 1.

Kamagi, Grace Priscillia. 2013. Analisis Life Cycle Cost Pada Pembangunan Gedung (Studi Kasus : Proyek Bangunan Rukan Bahu Mall Manado). Jurnal Sipil Statik Vol.1 No.8, Juli 2013 (549-556) ISSN: 2337-6732549

Kementerian Pekerjaan Umum. (2008). Permen PU No. 24/PRT/M/2008 tentang Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat tentang Pedoman Pemeliharaan dan Perawatan Bangunan Gedung Jakarta: Kemen PU.

Utari, Rini Pebri. 2018. Permodelan Proporsi SDM, Material Dan Alat Pada Proyek Konstruksi Gedung Sederhana & Non Sederhana Studi Kasus : Beberapa Proyek Konstruksi Di Wilayah Jawa Timur. Jurnal Hexagon Volume 3 no 1 2018.

Wongkar, Kristti, Yellih. 2016. Analisis Life Cycle Cost Pada Pembangunan Gedung. Jurnal Sipil Statik Vol.4 No.4 (253-262) ISSN: 2337-6732.




DOI: http://dx.doi.org/10.33087/jiubj.v21i1.1335

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

ADRESS JOURNAL

JURNAL ILMIAH UNIVERSITAS BATANGHARI JAMBI (JIUBJ)
Published by Lembaga Penelitian dan Pengabdian kepada Masyarakat
Adress: Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: jiubj.unbari@gmail.com, Phone: 0741-670700

Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.