Analisis Penerapan Manajemen Proyek dalam Perencanaan Instalasi Pengolahan Air Limbah (IPAL) di Perkotaan (Studi Kasus di Kawasan Tb. Simatupang)
Abstract
Urban WWTP development in the Simatupang area will integrating water life cycle, from managing waste water flow to reservoir, and then the raw water will be treated for drinking water. The most important effluent of waste water must be store first in the reservoir, and then treated for drinking water; it is possible direct converted from waste water to drinking water, however, the culture and religion of the community was not accepted. Construction of WWTP will be applied for business/mixuse area along 8 km and utilize 9 Ha land in the commercial area. The formulation of the problem of analyzing the application of project management in urban WWTP planning in the TB Simatupang area, is how the application of project management can affect the smoothness and success of the planning process for Urban WWTP development in the TB Simatupang area. In this problem formulation, the focus is placed on the effect of project management implementation on Simatupang WWTP planning. This led to research on evaluating the project management steps taken and their impact on the smoothness and success of the WWTP planning.
Keywords
Full Text:
PDFReferences
Howard S. Peavy, Donald R. Rowe, George Tchobanoglous, 1985, Environmental engineering, McGraw-Hill
Hindarko, S., 2003, Mengolah Air Limbah: Supaya Tidak Mencemari Orang Lain, Penerbit ESHA, Jakarta
Pasetia, A. T., Nurkhasanah, S. D., & Sudarminto, H. P. 2020. Proses Pengolahan dan Analisa Air Limbah Industri di Instalasi Pengolahan Air Limbah (IPAL). Distilat: Jurnal Teknologi Separasi, 6(2), 491-498.
Peraturan Gubernur DKI Nomor 122 Tahun 2005 Tentang Pengelolaan Air Limbah Domestik
Peraturan Menteri Lingkungan Hidup Nomor 68 Tahun 2016 Tentang Standar Batas Maksimum Baku Mutu Air Limbah Domestik
Sarwono, Jonathan. 2006. Metode Penelitian Kuantitatif dan Kualitatif. Yogyakarta: Graha Ilmu
S Bernard, NF Gray, 2000, Aerobic Digestion of Pharmaceutical and Domestic Wastewater Sludges at Ambient Temperature, Water Research, 34(3), 725-734
Siswanto, A. B., & Salim, M. A. 2019. Manajemen Proyek. CV. Pilar Nusantara.
DOI: http://dx.doi.org/10.33087/jiubj.v24i1.4373
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
|



