Selection Criteria for Named Subcontractors: Case Study of a Building Project

Seng Hansen, Ferdinand Fassa, Michael Michael

Abstract


The execution of construction projects involves many parties, one of which is subcontractors. In general, subcontractors can be divided into three types, namely domestic subcontractors, nominated subcontractors, and named subcontractors. Many studies have been carried out regarding the first two types of subcontractors, but studies related to named subcontractors are scarce. In contrast to nominated subcontractors, named subcontractors are selected by the main contractor based on a list of subcontractor names provided by the employer. This research aims to identify the criteria in selecting named subcontractors by the main contractor. This research applies a qualitative method approach with integrative literature review and interview techniques. The results show the company's experience, financial capabilities, technical capabilities, resource factors, and offer price factors as important selection criteria. This research contributes to the body of knowledge considering that there are still few studies on named subcontractors, especially regarding its selection criteria by the main contractor.


Keywords


construction; criteria; named subcontractors; selection.

Full Text:

PDF

References


Asmoro, A. 2014. Faktor yang dipertimbangkan kontraktor dalam memilih supplier pada pelaksanaan proyek konstruksi di Kota Medan. Tugas Akhir, Politeknik Negeri Medan.

Badan Pusat Statistik. 2022. Jumlah Perusahaan Konstruksi di Indonesia. Jakarta: BPS.

Cartlidge, D. 2012. Quantity Surveyor’s Pocket Book, 2nd Ed. Routledge.

Chappell, D. 2017. Understanding JCT Standard Building Contracts, 10th Ed. New York: Routledge.

Creswell, J.W. 2011, Educational Research: Planning, Conducting, and Evaluating Quantitative and Qualitative Research, 4th Ed. Boston, MA: Pearson Education.

El-Khalek, H.A., Aziz, R.F., Morgan, E.S. 2019. Identification of construction subcontractor prequalification evaluation criteria and their impact on project success. Alexandria Engineering Journal, 58(1), 217-223.

Faridi, A.S. and El-Sayegh, S.M. 2007. Significant factors causing delay in the UAE construction industry. Construction Management and Economics, 24(11), 1167-1176.

Fridkin, S. and Kordova, S. 2022. Examining criteria for choosing subcontractors for complex and multi-systems projects. Sustainability, 14(14988), 1-16.

Hansen, S. 2021. Characterizing interview-based studies in construction management research: analysis of empirical literature evidences. The 2nd International Conference on Innovations in Social Sciences Education and Engineering (ICoISSEE), 7 Agustus 2021.

Hansen, S. 2022. Identifikasi jenis bahaya dan parameter penilaian bahaya pada pekerjaan konstruksi. Paduraksa: Jurnal Teknik Sipil Universitas Warmadewa, 11(1), 94-102.

Hansen, S., Rostiyanti, S.F., and Purnomo. 2017. Conditional payments in the Indonesian construction industry. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 9(3), 06517001.

Henrico, and Soekiman, A. 2013. Analisis perilaku kontraktor utama dalam melakukan subkontrak konstruksi bangunan gedung di Indonesia. Jurnal Konstruksia, 5(1), 33-47.

Le, Y., Shan, M., Chan, A.P., and Hu, Y. 2014. Overview of corruption research in construction. Journal of Management in Engineering, 30(4), 02514001.

Martiano, A. 2021. Implementasi Faktor-Faktor yang Memengaruhi Kontraktor Utama dalam Keputusan Pemilihan Subkontraktor dan Supplier di Proyek Konstruksi Instalasi Pembuangan Air Limbah (IPAL) PT. Adhi Karya Kota Pekanbaru. Tugas Akhir, Universitas Islam Indonesia.

Muhendra, H. and Hasibuan, S. 2018. The sub-contractor selection of fly over construction project. Jurnal Manajemen Transportasi & Logistik, 5(1), 43-54.

Ngigi, E.W. 2021. Nominated sub-contracting on procurement performance in public hospitals in Nakuru County. International Journal of Economics, Commerce and Management, 9(10), 55-67.

Putri, C.G. and Nusraningrum, D. 2022. Subcontractors selection of building construction project using Analytical Hierarchy Process (AHP) and Technique for Others Reference by Similarity (TOPSIS) methods. Journal of Theoretical and Applied Management, 15(2), 261-273.

Rodrigo, M.N.N. and Perera, B.A.K.S. 2017. Management of nominated subcontractors in the construction of commercial buildings in Sri Lanka. Bhumi, The Planning Research Journal, 5(2), 1-21.

Rostiyanti, S.F., Hansen, S., and Ponda, T.N. (2020). Cause and effect of conditional payments provision to subcontractors. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(1), 04519045.

Saputra, A.A.I., Yanti, R.M.K., Wiguna, I.P.A., and Nurcahyo, C.B. 2017. Pengaruh komunikasi terhadap keberhasilan proyek pada hubungan kerja antara kontraktor dan subkontraktor. Jurnal Sains Terapan, 3(2), 87-95.

Shtub, A. and Cohen, Y. 2017. Introduction to Industrial Engineering, 2nd Ed. Boca Raton, FL, USA: CRC Press.

Talukhaba, A.A. and Mapatha, M. 2007. Selection framework for domestic subcontractors by contractors in the construction industry. Presented at CIB World Building Congress, CIB 2007-468, 768-780.

Tanuwijaya, E. and Tamtana, J.S. 2018. Analisis faktor-faktor yang memengaruhi kontraktor utama dalam pemilihan subkontraktor pada pelaksanaan proyek konstruksi. Jurnal Mitra Teknik Sipil, 1(2), 111-121.

Torraco, R.J. 2005. Writing integrative literature reviews: guidelines and examples. Human Resource Development Review, 4(3), 356-367.




DOI: http://dx.doi.org/10.33087/jiubj.v24i1.4980

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

ADRESS JOURNAL

JURNAL ILMIAH UNIVERSITAS BATANGHARI JAMBI (JIUBJ)
Published by Lembaga Penelitian dan Pengabdian kepada Masyarakat
Adress: Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: jiubj.unbari@gmail.com, Phone: 0741-670700

Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.