Analisis Faktor Keterlambatan Pekerjaan Konstruksi Drainase dengan Menggunakan Metode Kaiser Mayer Oklin (KMO)

Trinata Budi Nugraha, Nova Nevila Rodhi, Ayu Kurnia Ratna Sari

Abstract


This research aims to identify factors that cause delays in implementing the Urban Drainage project in Kepatihan Village, Bojonegoro Regency, using Regional Revenue and Expenditure Budget (APBD) funds. The research method used a population involved in drainage construction, using a saturated sampling technique with 39 respondents. Data collection used questionnaires for primary data and secondary data obtained from project schedules, cost budget plans and workforce data. Data analysis uses factor analysis, descriptive analysis, and cross tabulation analysis. Factor analysis uses the Kaiser Mayer Olkin Measure of Sampling Adequacy (KMO-MSA) method. The KMO test was carried out with a significance value from the Bartlett Sphericity Test of less than 0.05 to determine the suitability of the variables. The KMO-MSA process is carried out by calculating the Kaiser Mayer Olkin (KMO) value. The KMO value ranges between 0 and 1, where a higher value indicates a better match. Apart from that, Bartlett's Test of Sphericity was also carried out to test the significance of the relationship between variables. If the test results are significant (p < 0.05), then these variables are suitable for proceeding to further factor analysis. The results of the cross-tabulation analysis show that the labor variable (X2) is the main factor influencing delays in drainage construction projects, with a significance value (sig) < 0.05. Based on the results of the descriptive analysis, the labor factor indicator (X2) which is the factor that has the most significant influence on construction project delays, is the variable X2.1 in the form of labor availability with a mean of 5.67 and a percentage value of 5.12%. This suggests that a lack of labor can cause delays in project implementation, potentially affecting overall project progress and quality.


Keywords


urban drainage; construction project delays; labor; factor analysis; Kepatihan Village.

Full Text:

PDF

References


Ananda, R., Mulyani, E., & Rafie. 2021. Analisis Keterlambatan dan Kualitas Hasil Pekerjaan Pada Proyek Konstruksi Gedung. JeLAST: Jurnal Teknik Kelautan, PWK, Sipil, Dan Tambang, 8(1), 1–7.

Arianto, R., Carlo, N., & Mizwar, Z. 2023. Faktor Pengelolaan Operasi dan Pemeliharaan Irigasi di Kabupaten Tanah Datar. Jurnal Talenta Sipil, 6(2), 297-304.

Auliasari, V. R., Setyaning, L. B., & Nusantoro, A. 2023. Analisis Faktor-Faktor Keterlambatan Penyelesaian Proyek Konstruksi Jalan Berdasarkan Persepsi Stakeholder. Jurnal Surya Beton, 7(1), 96–104.

Buya, M., Ashad, H., & Watono. 2022. Analisis Faktor Keterlambatan Waktu Pelaksanaan Konstruksi Pada Pembagunan Kantor Bupati Pulau Taliabu dengan Metode Analytic Hierarchy Process. Jurnal Konstruksi: Teknik, Infrastruktur, dan Sains, 1(1), 44–53.

Puspitasari, Y. I., Mangare, J. B., & Pratasis, P. A. K. 2020. Analisis Faktor-Faktor Keterlambatan Pada Proyek Perumahan Casa De Viola dan Alternatif Penyelesaiannya. Jurnal Sipil Statik, 8(2), 141–146.

Syammaun, T., Rani, H. A., Amin, J., & Safriadi. 2023. Pengaruh Keterlambatan Pembangunan Proyek Konstruksi Akibat Pandemi Covid-19. SIKLUs : Jurnal Teknik Sipil, 9(1), 21–27.

Syahirman, T., Hasan, M., & Aulia, T. B. 2023. Dampak Pandemi Covid-19 dalam Pelaksanaan Proyek Konstruksi di Provinsi Aceh. Jurnal Arsip Rekayasa Sipil dan Perencanaan, 6(1), 22-31.

Triarman, Christopher & Sekarsari, Jane. 2018. Analisis Faktor Penyebab Keterlambatan Waktu pada Pekerjaan Struktur atas Proyek Konstruksi. Penelitian dan Karya Ilmiah. 3(1).

Yudha, I. M. E. K., & Utama, M. S. 2020. Budaya dan Willingness To Accept (WTA) Kompensasi Atas Alih Fungsi Lahan Pertanian di Kabupaten Gianyar: Kasus Banjar Bangkiansidem, Desa Kliki, Tegalalang. E-Jurnal Ekonomi dan Bisnis Universitas Udayana, 9, 787-810.




DOI: http://dx.doi.org/10.33087/jiubj.v24i2.5296

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

ADRESS JOURNAL

JURNAL ILMIAH UNIVERSITAS BATANGHARI JAMBI (JIUBJ)
Published by Lembaga Penelitian dan Pengabdian kepada Masyarakat
Adress: Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: jiubj.unbari@gmail.com, Phone: 0741-670700

Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.