Analisis Keterlambatan Pembangunan Gedung Kampus Poltekkes Banten
Abstract
In order to achieve maximum development, supervisory work is needed. Facilities and infrastructure are very vital and very important things in supporting the smoothness or convenience of the learning process, in relation to education that requires facilities and infrastructure and also their utilization both in terms of intensity and creativity in their use by lecturers and students in learning activities teach. Educational facilities are all the facilities needed in the teaching and learning process, both movable and immovable so that the achievement of educational goals can run smoothly, regularly, effectively and efficiently. In the 2021 fiscal year the Banten Poltekes campus received a budget of 9,779,346,000. The allocation of these funds was intended to continue the construction of the Phase VII Poltekes building, there were delays caused by disputes. These disputes stem from several factors between stakeholders, in which each stakeholder has different problems and this requires quite a long time to identify the causative factors and find the right solution. The purpose of this study was to analyze the factors causing delays in the construction of the Polytechnic Health Campus building in Banten. The research was conducted using a qualitative method by means of a narrative description, in which the researcher conducted interviews with the Director of PT. Rahandika Nusa Perkasa. The results of the study found that the factors causing the delay in the construction of the Poltekkes campus building in Banten were due to the very short time given, the selection of workers who were not good, the frequent exchange of workers, the lack of material transportation equipment.
Keywords
Full Text:
PDFReferences
Assaf, A., 1995. Cause of delay in large building construction project.
Andalia, Fanny. 2015. Pengembangan Sistem Infomasi Pengolahan Data Pencari Kerja Pada Dinas Sosial dan Tenaga Kerja Kota Padang. Jurnal Ilmiah Komputer dan Informatika (KOMPUTA), Vol 4(2), 93-98
Ahmed, Salma & El-Sayegh, Sameh. (2022). The challenges of sustainable construction projects delivery – evidence from the UAE. Architectural Engineering and Design Management. 18. 1-14.
Firmansyah, M. R., Nugroho, M. W., Yulianto, T., & Majid, A. 2021. Analisis Time Schedule Proyek Rehabilitasi Gedung Puskesmas Tambakrejo-Jombang. Reaktip: Jurnal Rekayasa dan Aplikasi Teknik Sipil, 1(1), 47-56.
Hansen, S. 2015. Manajemen kontrak konstruksi. Gramedia Pustaka Utama.
Jannah, M. P. N., & Musjtar, D. N. 2019. Penyelesaian Sengketa Wanprestasi Akibat Keterlambatan Pelaksanaan Perjanjian Kontsruksi Bangunan. UIR Law Review, 3(2), 41-49.
Limantoro, C., Andi, A., & Rahardjo, J. 2023. Analisa Faktor Cost Overruns dengan Metode Interpretive Structural Modelling pada Beberapa Proyek Konstruksi di Indonesia. Dimensi Utama Teknik Sipil, 10(1), 20-37.
Nicholas, J. M. 1990. Managing business and engineering project.
Peraturan Menteri Pekerjaan Umum No.24 Tahun 2008 tentang Pedoman Pemeliharaan Banungan Gedung.
Syahputri, N. G. 2022. Identifikasi Faktor Penyebab Klaim yang Berpotensi Menjadi Dispute pada Proyek Konstruksi Bangunan Gedung Rumah Sakit. Jurnal Pendidikan Tambusai, 6(3), 13694-13702.
Siahaan, Fanny., 2015, Tinjauan Tentang Pekerjaan Arsitektur Dalam Proyek Konstruksi Dengan Pendekatan Pada Bangunan Gedung Bertingkat, SCALE, 3(1), 344-359
DOI: http://dx.doi.org/10.33087/jiubj.v24i1.4393
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
|